Installation and Care

Wall panel installation steps, coordination with ceiling services and cleaning guidance for PET felt.

Use the installation detail for the selected product.

Maintenance and Cleaning

  • Use a soft, damp cloth to remove dust. Regular dusting and vacuuming helps maintain the appearance of the panels.
  • Use low suction power and a soft brush attachment when vacuuming.
  • Blot stains gently with a soft sponge or cloth. Use minimal pressure and avoid rubbing or scrubbing.
  • Do not use excessive water or cleaning fluid. If necessary, provide adequate ventilation to dry the panel.
  • After treating the stain, blot away remaining moisture with a clean, dry cloth. Allow the panel to dry away from direct heat and sunlight.
  • Avoid installing coloured panels in locations exposed to prolonged direct sunlight or heat.

Wall Panel Installation

  1. 01 Surface Preparation

    Before starting installation, ensure that the surface is clean (free from dust, peeling paint or dirt), structurally sound, dry and free of defects.

  2. 02 Measurement and Layout

    Measure the area and mark the module layout from the approved drawing. Define joints, cutting direction and edge finishes. If site cutting is needed, follow the product’s installation detail.

  3. 03 Dry Fit

    Dry-fit the panels on the prepared surface before applying adhesive. Check the alignment and make any required cuts with a utility knife and ruler.

  4. 04 Tools Required

    Clean gloves, utility knife, metal ruler, tape measure, ladder or scaffolding, mastic gun, J-Roller (pressure roller), construction adhesive and spray adhesive.

  5. 05 Bonding

    Apply installation adhesive with a cartridge gun, working in a zigzag towards the centre. Keep the adhesive approximately two finger-widths inside the edges to prevent squeeze-out.

  6. 06 Pressing and Joints

    Press the panel evenly onto the surface. Align adjacent panels and follow the joint dimensions specified for the product.

  7. 07 Cleaning

    Remove excess adhesive before installing the next panel. Keep adhesive away from the visible face.

Ceiling Systems

Baffles and ceiling rafts are suspended on fine wires. Coordinate their layout with lighting, sprinklers and ventilation before installation. Spacing or panel lengths can be adapted to these services, so sharing the reflected ceiling plan early helps resolve details.

Dimensions, quantities, suspension points and installation levels are defined in the project documentation.

Scope of Installation

We offer product supply or a complete service including installation. For larger projects, coordinated supply and installation help ensure that the installed system follows the required details.

Plan Your Project

Share plans, sections or photographs so we can discuss suitable products, thicknesses and layouts.